• Register
  • Login

International Research Journal on Advanced Science Hub

  1. Home
  2. Implement Industrial 4.0 into process improvement: A Case Study in Zero Defect Manufacturing

Current Issue

By Issue

By Author

Author Index

Keyword Index

About Journal

News

Aims and Scope

Editorial Board

Publication Ethics

Indexing and Abstracting

Related Links

FAQ

Peer Review Process

Journal Metrics

Advertising policy

Editor and Reviewer guidelines

Digital Archiving & Preservation Policy

Copyright Terms

Licensing Terms

Editorial Process - Peer Reviewed

Implement Industrial 4.0 into process improvement: A Case Study in Zero Defect Manufacturing

    Authors

    • Nguyen Kieu Viet Que 1
    • Nguyen Thi Mai Huong 1
    • Huynh Tam Hai 1
    • Vo Dang Nhat Huy 1
    • Le Dang Quynh Nhu 1
    • Minh Duc Ly 2

    1 Faculty of Commerce, Van Lang University, Ho Chi Minh City, Vietnam

    2 Faculty of Commerce, Van Lang University, 69/68 Dang Thuy Tram, Ward 13, Binh Thanh District, HCMC, Vietnam

,

Document Type : Case study

10.47392/irjash.2023.013
  • Article Information
  • Download
  • Export Citation
  • Statistics
  • Share

Abstract

This study describes in detail step-by-step implementation of quality improve- ment activities in mechanical processing plants. Describe how to imple-  ment quality 4.0 technologies in DMAIC (Define-Measure-Analysis-Improve- Control) phases. As well as using statistical formulas, experimental design in data analysis at each phase of DMAIC. This study proposes to use Quality 4.0 Technology in product quality improvement activities in mechanical product processing factories with the aim of becoming zero defect manufacturing. The results of the research found are repair rate reduced from 600 PPM monthly to 0 PPM, processing capacity increased from Cpk1.02 to Cpk2.56, reduce time for inspection product from 702 hours per year (calculated to save USD 2106 per year), reduce the amount of repair products by 196 products per year (calculated in terms of money is reduced by 917 USD per year) and reduce 1 roughing stage (calculated in terms of cost reduction about 171288 USD per year). The roughness dimension has reduced measurement time by about 364 hours per year (save 1092 USD per year). Processing digital signals from sen- sors in an oily environment is a big challenge for researchers. Improving the security of digital data is also a limitation of this study.  This study proposes a model to apply statistical hypothesis testing methods to analyze real data collected from each machining stage and perform each job according to each corresponding DMAIC phase of the model. In addition, digital processing tech- niques and computer vision techniques are also deployed in the improve phase to complete the goal of improving the semiautomatic production stage to the automatic production stage.

Keywords

  • Zero Defect
  • Industrial 40
  • DMAIC
  • Lean Six Sigma
  • XML
  • PDF 2.85 M
  • RIS
  • EndNote
  • Mendeley
  • BibTeX
  • APA
  • MLA
  • HARVARD
  • CHICAGO
  • VANCOUVER
    • Article View: 222
    • PDF Download: 502
International Research Journal on Advanced Science Hub
Volume 5, Issue 02
February 2023
Page 55-70
Files
  • XML
  • PDF 2.85 M
History
  • Receive Date: 06 January 2023
  • Revise Date: 11 February 2023
  • Accept Date: 15 February 2023
Share
Export Citation
  • RIS
  • EndNote
  • Mendeley
  • BibTeX
  • APA
  • MLA
  • HARVARD
  • CHICAGO
  • VANCOUVER
Statistics
  • Article View: 222
  • PDF Download: 502

APA

Viet Que, N. K. , Mai Huong, N. T. , Hai, H. T. , Huy, V. D. N. , Nhu, L. D. Q. and Ly, M. Duc (2023). Implement Industrial 4.0 into process improvement: A Case Study in Zero Defect Manufacturing. International Research Journal on Advanced Science Hub, 5(02), 55-70. doi: 10.47392/irjash.2023.013

MLA

Viet Que, N. K. , , Mai Huong, N. T. , , Hai, H. T. , , Huy, V. D. N. , , Nhu, L. D. Q. , and Ly, M. Duc. "Implement Industrial 4.0 into process improvement: A Case Study in Zero Defect Manufacturing", International Research Journal on Advanced Science Hub, 5, 02, 2023, 55-70. doi: 10.47392/irjash.2023.013

HARVARD

Viet Que, N. K., Mai Huong, N. T., Hai, H. T., Huy, V. D. N., Nhu, L. D. Q., Ly, M. Duc (2023). 'Implement Industrial 4.0 into process improvement: A Case Study in Zero Defect Manufacturing', International Research Journal on Advanced Science Hub, 5(02), pp. 55-70. doi: 10.47392/irjash.2023.013

CHICAGO

N. K. Viet Que , N. T. Mai Huong , H. T. Hai , V. D. N. Huy , L. D. Q. Nhu and M. Duc Ly, "Implement Industrial 4.0 into process improvement: A Case Study in Zero Defect Manufacturing," International Research Journal on Advanced Science Hub, 5 02 (2023): 55-70, doi: 10.47392/irjash.2023.013

VANCOUVER

Viet Que, N. K., Mai Huong, N. T., Hai, H. T., Huy, V. D. N., Nhu, L. D. Q., Ly, M. Duc Implement Industrial 4.0 into process improvement: A Case Study in Zero Defect Manufacturing. International Research Journal on Advanced Science Hub, 2023; 5(02): 55-70. doi: 10.47392/irjash.2023.013

  • Home
  • About Journal
  • Editorial Board
  • Submit Manuscript
  • Contact Us
  • Sitemap

News

  • Career at RSP SCIENCE HUB 2024-05-03

Newsletter Subscription

Subscribe to the journal newsletter and receive the latest news and updates

© Journal Management System. Powered by iJournalPro.com